Skip to main content

Create Your First Work Order

Work orders (called "Actions" in Zeltask) are tasks that need to be completed by your team. This guide walks you through creating your first action.

Before You Start

  • You need at least Staff Member permissions
  • For assignment, users or teams should already exist in the system
  • Optionally, have assets and locations created to link to the action

Steps

Step 1: Open the Actions module

  1. Click Actions in the left sidebar
  2. The actions list loads with any existing work orders

[Screenshot: Sidebar with Actions menu item highlighted]

Step 2: Start creating an action

  1. Click Create Action in the top-right corner
  2. The action creation form opens

[Screenshot: Actions list with Create Action button highlighted]

Step 3: Select category and type

  1. Choose a Category that matches the work area:

    • Maintenance
    • Plumbing
    • Electrical
  2. Select the Type:

    • Preventive — Scheduled, recurring maintenance
    • Reactive — Response to an issue or urgent need

[GIF: Click Category dropdown to select Maintenance, then click Type dropdown to select Reactive]

Step 4: Enter title and description

| Field | Purpose | Example | |-------|---------|---------|| | Title | Brief, clear name for the task | "Monthly pump inspection" | | Description | Detailed instructions for the technician | "Check pressure levels, inspect seals, lubricate bearings" |

[Screenshot: Create Action form with Title and Description fields completed]

Step 5: Add supporting media (optional)

  1. Click Add Media to attach photos
  2. Upload images showing the current condition, location, or specific issue
  3. Supported formats: JPG, PNG, GIF

Visual references help technicians understand exactly what needs attention.

Step 6: Set time and priority

FieldOptions
Estimated TimeHow long the task should take
PriorityNone, Low, Medium, High

[GIF: Click Priority dropdown and select High]

Step 7: Configure schedule (for preventive actions)

For recurring tasks, set up a schedule:

  1. Select Recurrence: Daily, Weekly, Monthly, or Yearly
  2. Configure the specific pattern (e.g., every Monday, first day of month)
  3. Set the Start Date
  4. Optionally set a Due Date for the first occurrence

[GIF: Toggle Recurring on, select Weekly recurrence, then open date picker to set Start Date]

Step 8: Assign responsibility

Choose who should complete the work:

  • Assign to User — Select a specific person
  • Assign to Team — Any team member can pick it up

[GIF: Click Assigned To dropdown and select a user from the list]

FieldPurpose
LocationWhere the work should be performed
AssetWhich equipment the action relates to

[GIF: Click Asset dropdown and select an asset from the list]

Linking creates connections for tracking and reporting.

Step 10: Add materials and costs (optional)

FieldPurpose
InventorySpare parts or materials needed
VendorExternal provider if contractor work is required
AttachmentsDocuments like procedures or manuals
CostBudget or expense tracking

Step 11: Submit the action

  1. Review all fields
  2. Click Submit

[Screenshot: Completed Create Action form with Submit button highlighted]

The action is created and assigned. The responsible user or team receives a notification.

Tracking Your Action

After creation, the action moves through states:

StateMeaning
OpenCreated, waiting to be started
In ProgressTechnician is actively working on it
On HoldTemporarily paused
DoneCompleted

[Screenshot: Action detail view showing status, assigned user, and linked asset]

Click any action card to view details, add comments, or check progress.

Example: Reactive Action

Here's a quick example of creating a reactive work order:

FieldValue
CategoryMaintenance
TypeReactive
TitleClean spill in Corridor 3
DescriptionOil spill near loading dock, use absorbent material
PriorityHigh
Estimated Time15 minutes
Assigned ToCleaning Team
LocationCorridor 3

Tips

  • Use clear, action-oriented titles ("Inspect pump seals" not "Pump")
  • Set realistic time estimates to help with workload planning
  • For preventive maintenance, start with simple weekly or monthly schedules
  • Link actions to assets to build maintenance history